Set building · New York

Sets that load in, strike and move

We build sets and scenic from the production designer's drawings. Flats, platforms and set pieces are made to be loaded in, struck and moved.

Our drawing: A scenic flat in front elevation and a platform in side elevation.

What it covers

  • Hard and soft flats
  • Platforms, stairs and ramps
  • Facades and architectural pieces
  • Doors and windows that actually open
  • Show portals and proscenium pieces
  • Moving and rolling scenic pieces
  • Scenic painting, texture and aging

Materials and finishes

  • Lauan and plywood skins
  • Steel and aluminum framing
  • Carved foam with a hard coat
  • Vacuum-formed and cast details
  • Scenic paint, glazes and aging

How the job runs

  1. 01

    Drawings in

    Send the designer's drawings, the ground plan and the stage or venue specs. Model photos help.

  2. 02

    Costed plan

    We price it piece by piece and set the build schedule from your load-in date.

  3. 03

    Shop drawings and samples

    You see shop drawings for framing and joins, plus paint and texture samples, before we cut.

  4. 04

    Build

    Pieces are built to break down for the truck and for the doors at the venue.

  5. 05

    Install and strike

    We load in, set and level on site, and we come back to strike when you wrap.

Who it’s for

Fashion
Show sets and backdrops that have to look finished on camera and from the front row.
Entertainment
Scenic for film, TV, stage and live events, built from the production designer's plans.
Luxury brands
Launch and event sets that carry the brand's own finish standard.
Agencies
One shop for the build when the creative is yours and the date is fixed.
Architects
Temporary structures and set pieces that have to sit inside a real building.

What to send us

  • The production designer's drawings or sketches
  • A ground plan and section of the stage or venue
  • Load-in and strike dates
  • Anything that flies, moves or gets walked on
  • A budget range

Rough is fine. If something isn’t decided yet, say so.

Send your drawings